Abilene Crane Rental Co. Call (325) 308-1613
A white five-axle all-terrain crane on outrigger pads lowers a gray rooftop unit onto a long metal-paneled building beside mesquite pasture.

Abilene Crane Rental Co.

(325) 308-1613

Serving Clyde, TX from Abilene.

Crane Rental in Clyde, TX

Crane rental in Clyde starts with Interstate 20 and with the City of Clyde's own code, because the town sits on the interstate and its City publishes building-permit, fee and truck-parking rules that shape a lift. The Handbook of Texas places Clyde on Interstate 20 and Farm Road 604, eight miles east of Abilene and five miles west of Baird in northwestern Callahan County, though its Callahan County entry says nine miles from Abilene. The Handbook's table gives Clyde a 2020 population of 3,811, and the Census Bureau puts Callahan County at 13,708 in 2020 and 14,491 by its July 1, 2025 estimate. Baird, not Clyde, is the county seat.

Two kinds of crane rental apply in Clyde as anywhere: operated, where the operator comes with the crane and the time is billed by the hour above a set minimum, and bare, the crane alone, run by your own operator, who must meet OSHA's section 1926.1427. Excavators, loaders, aerial lifts, forklifts and dozers go out on daily, weekly or monthly terms. Every job begins with a free written quote showing the crane or machine, how it is staffed, the hour minimum or the rental term, delivery from Abilene, any permit, escort or mats, and every charge, with any tax on its own line. Published national price figures, each with its source and date, are gathered on the crane rental cost page.

Serving all of Clyde

every crane and machine is quoted in writing before anything is booked.

Free quote

Fields marked * are required.

Your quote comes in writing at no charge, and no crane or machine is scheduled until you say yes.

I-20 Bridges, Mesquite Sky and a Planned Pipeline Around Clyde

TxDOT's 2027 - 2030 Rural Transportation Improvement Program for Callahan County lists the interstate work coming to Clyde's county. It schedules replacement of the eastbound and the westbound I-20 bridges over the Union Pacific railroad, both with a 2028 let year, the year TxDOT plans to let the contract; a seal coat from the Taylor County line to just east of BI 20-T, also 2028; and an overlay from the Taylor County line to Baird's west city limit in 2029, a stretch that passes Clyde. The bridge rows do not say where in the county the crossings are, and the plan prints no publication date. TxDOT has also held a virtual public meeting on widening I-20 to six lanes in Taylor and Callahan Counties, with a study corridor "from the western city limits of Abilene to near Buck Creek Road (CR 108)", "a total of 15.7 miles".

Wind farms are the county's other large crane sites. On March 23, 2022, Clearway Energy Group announced "reaching commercial operations last quarter at its 340 MW Mesquite Sky wind farm in Callahan County, Texas", with 68 turbines; its January 5, 2021 release, which then gave the project as 345 MW, named Siemens Gamesa Renewable Energy as the turbine supplier. EDP Renewables North America's Lone Star Wind, 400 MW installed in two phases (its project page, dated September 3, 2020), spans Callahan and Shackelford Counties, and our Albany crane rental page covers the Shackelford side. Neither Clearway release names the nearest town, so a route to a turbine pad starts from the site's own address, and the farm's owner sets who may lift there.

Soil and terrain set Clyde's off-road work. The Handbook's Callahan County entry says "Most of the county has light to dark loamy soils with clayey to loamy subsoils" and "The elevation ranges from 1,500 to 1,900 feet", and that "The county is divided by a low range of hills known as the Callahan Divide, which runs from east to west." On clayey subsoil, a crane pad or a trench wall deserves a fresh look after rain, and OSHA section 1926.651 already requires a trench inspection after every rainstorm. Oil is part of the same ground: the Handbook dates oil production around Clyde to about 1924.

Water work rounds out the list. The City of Clyde's water project page, in an article dated March 6, 2019, says the City had been informed it would receive a grant and loan package to construct a pipeline from Lake Fort Phantom to Clyde's water treatment plant; a July 22, 2015 update reposted there gives the route as approximately 21 miles across Jones, Shackelford and Callahan Counties, and the City bought water rights in the lake with bonds in 2013. We have not seen a source saying the line was finished, so treat it as planned. Closer to town, the Texas Parks and Wildlife Department's Lake Clyde page puts the lake 5 miles south of Clyde on the headwaters of the Pecan Bayou, impounded in 1970, with the City of Clyde as its controlling authority.

Cranes for Clyde: Interstate Bridges, Turbines and Town Lifts

Clyde's crane work splits along the interstate. Lifts on or beside I-20 answer to TxDOT's work zones and traffic control; lifts in town answer to the City's permits and its truck-parking rule; lifts out on leases and wind sites answer to the county's clay and the owner's site rules. Each crane below starts from the Clyde fact that matters most for it.

Truck Cranes for Clyde Businesses and Permitted Builds

Clyde is close enough to Abilene on I-20 that a hydraulic truck crane, the telescopic crane built on a highway-legal chassis, is the default for one-day lifts in town: a rooftop unit, a steel frame, a sign or a precast piece for a business or a new building. The City's code puts the paperwork first. Section 3.01.001(b) bars starting construction "without first obtaining a permit to construct same from the city building permit agent," and for nonresidential work section 3.01.003(a)(1) has the owner apply to the building official before building, altering or demolishing, so the crane date follows the permit. The clayey subsoil the Handbook describes can soften after rain under the outrigger floats, the pads that carry each outrigger beam's load to the ground. See truck crane rental for load charts and the staffing choice.

All-Terrain Cranes for Clyde and Callahan County Wind Farms

Heavy turbine work of the kind Mesquite Sky and Lone Star Wind involve can call for an all-terrain crane, which drives the interstate on its own axles and steers all of them on a site. Height is the first check: under 14 CFR 77.9(a), construction "more than 200 ft. AGL at its site" needs FAA notice, and the fact that we found no airport in Clyde does not change that rule out in the county. Weight is the second: the counterweight follows on its own trucks, and each one past Texas's legal size or weight needs a TxDMV permit. The third is the owner, whose site rules and schedule govern every lift on a wind farm. All-terrain crane rental lists the axle counts, road speeds and charts.

Rough-Terrain Cranes on Clyde's Oil Leases and Lake Ground

Off the pavement around Clyde, a rough-terrain crane is the machine built to lift on unimproved ground, with four-wheel drive and several steering modes. That ground has a long oil history: the Handbook records a 1923 discovery in Callahan County, about a million barrels a year in the early 1990s, and 79,523,155 barrels of crude from 1923 to 1991. To the south, TPWD lists Lake Clyde at 449 acres with a 30-foot maximum depth, and because the City of Clyde is its controlling authority, the City is the first call for work at the lake. Wherever an RT sets up, OSHA section 1926.1402 puts ground preparation on the controlling entity, the employer with overall responsibility for the project, such as a prime or general contractor, and the crane itself arrives on a trailer. Steering modes and trailer moves are explained under rough-terrain crane rental.

When a Clyde-Area Job Calls for a Crawler Crane

A crawler crane sits on tracks, comes in pieces on many trucks and is assembled on site, so in Clyde's county it belongs to long jobs such as the I-20 bridge replacements over the Union Pacific railroad that TxDOT's Callahan County plan lists for 2028. Bridge work of that kind, setting beams over a rail line beside interstate traffic, can call for heavy picks at long radius from one fixed position, which is where a crawler or a large all-terrain crane earns its place; the crane a TxDOT contractor brings is that contractor's choice. Assembly and teardown fall under OSHA sections 1926.1403 and 1926.1404, and the tracks want mats on clayey subsoil. For lattice against telescopic crawlers, see crawler crane rental.

Boom Trucks for Clyde Houses, Trusses and Rooftop Units

For a new house or shop in Clyde, a boom truck, a telescopic crane mounted behind the cab of a working truck, can bring the trusses or the HVAC unit and set them in one trip. The City requires a building permit for that kind of work and posts residential and commercial permit forms dated 3/2022, so the delivery is booked around the permit. Check the truck against Clyde's code as well: section 12.03.031 covers "Any and all trucks, with trailers, which have at least six (6) wheels" that are "rated to be in excess of 26,000 pounds gross weight", so a boom truck towing a trailer can fall under the street-parking ban described below. Boom truck rental weighs the truck against a crane or a telehandler.

Carry Deck Cranes for Clyde Shops and Plant Rooms

A carry deck crane is the small industrial crane that lifts from outriggers, drives a load on its hook or hauls it on its deck, and in Clyde it fits indoor and tight-yard work rather than a factory, since the sources we read list no factory in the town. One named site of that type is the City's water treatment plant, the end point of the planned Fort Phantom pipeline; inside any plant, moving a pump or motor across a floor where a truck crane cannot reach is carry deck work. The machine's width against the doors, the floor's capacity and the rating that applies decide the fit. The three ratings and class widths are explained in carry deck crane rental.

Lift Plans for Clyde Picks Beside I-20 and the Rail Line

A pick beside I-20 or the railroad in Clyde calls for a written lift plan that covers traffic as well as the load. Under 29 CFR 1926.200(g), signs, barricades and other devices protecting the crew must "conform to Part 6 of the MUTCD", and 29 CFR 1926.201(a) holds flaggers to the same Part 6. Inside the work area, 29 CFR 1926.1425 lets only the employees needed to receive a load stand in the fall zone, the area where a dropped load could land, while it is landed, and when workers must be in that zone it wants the load rigged by a qualified rigger, a rigger who meets the bar OSHA sets for a qualified person. Wind belongs in the plan too: NWS San Angelo reported a 56 mph gust at the Abilene Airport on March 17, 2021, and another 56 mph gust later that day after a cold front. Standard and critical plans are explained in rigging and lift planning.

Heavy Haul Into Clyde and the City's Semi-Truck Parking Ban

Heavy haul into Clyde means an I-20 run under TxDMV's size, weight and escort rules, then one local rule at the curb. Clyde's semi-truck parking ordinance, section 12.03.033(a), says "It shall be unlawful for the driver or owner of any semi-tractor truck or trailer to park the same" on "any city street", and a loaded lowboy rig rated over 26,000 pounds fits the code's definition of that vehicle. One exception, section 12.03.034(b), is a truck there "for the purpose of immediately delivering or picking up merchandise to or from a specific designated location", so plan the drop to unload on the job site and leave rather than stage on the street. The City's fee schedule lists no oversize-vehicle fee. Permits, escorts and flags are covered in heavy haul and machinery moving.

Equipment Rental for Clyde: Pipe Trenches, House Lots and Schools

Clyde's equipment work comes from three places in its public record: houses and businesses built under City permit, utility and water work including the planned Fort Phantom pipeline, and the county's oil and ranch ground. Rentals run daily, weekly or monthly with the maker's operating information, and any digging waits for the Texas 811 call two business days ahead.

Excavators for Clyde's Planned Pipeline and Utility Trenches

Long pipe trenches are excavator work, and Clyde has one on paper: the planned pipeline from Lake Fort Phantom to the City's water treatment plant, which a 2015 update put at approximately 21 miles from Fort Phantom Hill to Clyde across Jones, Shackelford and Callahan Counties. In town, service lines and taps are smaller versions of the same dig. Texas 811 comes first, then OSHA: 29 CFR 1926.652 calls for sloping, shoring or a shield in a trench 5 feet deep or more that is not dug wholly in stable rock, and section 1926.651 has a competent person inspect the trench daily and "after every rainstorm or other hazard increasing occurrence," which matters in clayey subsoil. Compact or full size? Excavator rental sets out dig depths and weights.

Skid Steers and Track Loaders for Clyde Lots and Driveways

A wheeled skid steer or a compact track loader does a Clyde house lot's small earthwork: rough grade, fill, flatwork prep and cleanup. If the lot's driveway meets a state highway, Clyde's code section 3.06.001(b) says the City "adopts and concurs in the regulations adopted by the state department of transportation" for access driveways, 43 TAC chapter 11, so TxDOT's rules govern that connection. Tracks spread the load on clayey subsoil after rain; wheels move faster on pavement and a dry pad. OSHA's rollover subpart, section 1926.1000, covers rubber-tired skid-steer equipment built after July 15, 2019 for construction use, and section 1926.602 requires seat belts. Skid steer and track loader rental gives the capacities and ground pressures.

Telehandlers for Clyde Framing, Roofing and Commercial Builds

A telehandler, the forklift with a telescoping boom, lifts bundled trusses, roofing and block to a roof or an upper floor on a Clyde build where a straight mast cannot reach. OSHA's powered-industrial-truck training rule, 1910.178(l), applies on construction sites by way of section 1926.602(d), and its certification paragraph has the employer write down who was trained, when the training and evaluation happened, and who gave them. A hook or winch can make the machine a crane in OSHA's eyes, since an OSHA letter of June 21, 2012 says multi-purpose equipment falls under the crane standard "when configured, and operated as, a crane." On a clayey lot, level the frame on firm ground before raising a load. The height and reach ratings sit side by side in telehandler rental.

Boom Lifts for Clyde School Buildings and Overhead Work

Exterior work up high on a Clyde building, such as lights, gutters, signs and roof edges, is boom lift work, a basket on an arm that reaches up and out. School facility crews are among the readers here: Clyde Consolidated ISD lists Clyde Elementary, Clyde Intermediate, Clyde Junior High and Clyde High School. Overhead lines decide the set-up. OSHA's aerial lift fact sheet sets a 10-foot standoff from lines treated as live, Texas's chapter 752 bars equipment within six feet of an overhead high voltage line without the 48-hour notice and an agreed safeguard, and that notice goes to the line's own operator; Taylor Electric Cooperative is one possibility, since a 2019 Texas House resolution lists Callahan among the counties whose residents it serves. Boom lift rental covers platform heights and outreach.

Scissor Lifts for Clyde Classrooms, Gyms and Shops

Indoors on a flat slab, a scissor lift's railed deck raises a worker straight up to a ceiling grid, a light fixture, ductwork or a cable tray, which makes it the simpler machine for school and shop interiors in Clyde. In OSHA's view, set out in an August 1, 2000 letter, a scissor lift is a scaffold rather than an aerial lift, and OSHA's hazard alert on scissor lifts lists the scaffold training requirements, 1926.454, among the rules that apply. Outdoors, the same alert says "Use the scissor lift outside only when weather conditions are good," and OSHA's scaffolding eTool puts the general limit for outdoor-rated units at winds under 28 miles per hour. Scissor lift rental compares slab electric and rough-terrain models.

Forklifts for Clyde Deliveries and Material Yards

The sources we read name no warehouse or plant in Clyde, so this page treats a Clyde forklift as job-site equipment: unloading and staging pallets of block, roofing and pipe for permitted builds and utility jobs. Pick the tires for the ground, pneumatic or a rough-terrain Class VII truck on gravel and clay, cushion tires on a slab. Under 29 CFR 1910.178(l), OSHA also requires refresher training when an operator has been seen driving unsafely, has had an accident or a near miss, or fails an evaluation; we ask every renter to have its operators trained to that rule. Forklift rental covers capacities, masts and tires.

Backhoes and Wheel Loaders for Clyde Taps, Ditches and Stockpiles

A backhoe loader digs a service trench, lays the line and backfills it with one machine and one operator, which suits house connections in Clyde; a wheel loader moves base, loads trucks and works a stockpile. The City's fee schedule shows no street-cut or right-of-way excavation fee, so ask the City at 222 Oak Street how it handles a cut in a city street before the bucket goes in, and where a driveway meets a state highway, the TxDOT rule above applies. Texas 811's FAQ says the excavator must renotify "if the commencement is delayed beyond fourteen days of the original notice," and OSHA section 1926.651 wants spoil held back by retaining devices or kept at least 2 feet from the edge. Backhoe and loader rental lists dig depths and bucket sizes.

Dozers for Clyde Pads, Lease Roads and Callahan Divide Slopes

A dozer cuts, pushes and spreads earth with its blade, and Clyde's ground gives it three kinds of work: building pads on town lots, lease roads in a county where oil was discovered in 1923, and slopes in a county the Handbook puts between 1,500 and 1,900 feet in elevation, split east to west by the Callahan Divide. A long pipeline like the one Clyde has planned can also call for a graded work strip along its route. Grade after Texas 811 has marked the buried lines, and keep OSHA's rules in view: its rollover subpart, section 1926.1000, takes in crawler tractors, and section 1926.602 asks for seat belts and lets a machine with a blocked rear view back up only with a working reverse signal alarm or a worker signaling. Dozer rental lists blade sizes and machine weights.

Clyde's Building Permits, Fees, Truck Rule and I-20 Work Zones

Clyde publishes its rules, and several of them shape a lift or a machine rental. The City of Clyde fee schedule prices building permits at "$50.00 per housing unit" for residential work and "$50.00 per $50,000.00 of construction cost" for commercial work, and contractor registration at "$25.00 per year"; it lists no street-cut, right-of-way excavation, house-moving or oversize-vehicle fee. Code section 3.01.001(a) lets a permit issue only once the building permit agent finds the site "reasonably safe from flooding." The semi-truck parking ban covers every city street, with its delivery exception, and a violation is "a class C misdemeanor" with a fine of "not more than five hundred dollars ($500.00)." The code on eCode360 includes legislation through Ord. No. 2026-014, adopted March 24, 2026, and City Hall is at 222 Oak Street.

On the interstate, the Rural TIP's projects, the bridge replacements and seal coat set for 2028 and the overlay for 2029, mean work zones to plan around for any lift or delivery beside I-20, and TxDOT's I-20 widening at Abilene is tracked on our Abilene construction data page. We found no airport in Clyde on a City, county, TxDOT or FAA page, but 14 CFR 77.9(a) still makes a boom that tops 200 feet above ground an FAA notice case. Power lines answer to the State's chapter 752 and OSHA section 1926.1408; digging answers to Texas 811 and the Utilities Code, chapter 251. Our permit and power line guide for the Abilene area sets out each rule.

  • Clyde Code section 3.03.004: the building code is the International Residential Code as adopted in section 214.212 of the Texas Local Government Code.
  • Clyde Code section 3.01.003(a)(1): for nonresidential work the owner must "first make application to the building official and obtain the required permit."
  • OSHA, 29 CFR 1926.1408(c): where the voltage table is used, the utility must give the line's voltage "within two working days of the employer's request."
  • TxDMV: loads wider than 14 feet, higher than 16 feet or longer than 110 feet stay parked on the holidays TxDMV lists unless it grants an exception.
Questions

Clyde FAQs

How far is Clyde from Abilene for a crane delivery?

About eight miles. The Handbook of Texas puts Clyde eight miles east of Abilene on Interstate 20, though its Callahan County entry says nine. Truck cranes and all-terrain cranes make the trip under their own power, and a machine on a trailer has a short interstate run. Delivery shows up as a separate charge on the written quote, next to the crane or machine, its staffing, the hour minimum or rental term, and any permit, escort or mats.

Can a lowboy or semi park on a street in Clyde?

Not on a city street, apart from a delivery exception. Clyde Code section 12.03.033(a) makes parking a semi-tractor truck or trailer on any city street unlawful, and the code counts a truck with a trailer, at least six wheels and a rating over 26,000 pounds. Section 12.03.034(b) excuses a truck that is immediately delivering or picking up merchandise at a specific designated location, and a violation is a class C misdemeanor. Plan the delivery to unload on the site.

Do I need a City of Clyde permit to build or set equipment?

For building work, yes: section 3.01.001(b) bars beginning construction without a permit from the city building permit agent, and the fee schedule prices it by housing unit or by construction cost. For the crane or machine itself, we found no City fee, since the schedule lists no oversize-vehicle, street-cut or right-of-way excavation charge. Before a crane sets up in a city street, ask City Hall at 222 Oak Street what it requires, and set the date after that.

Can a crane work at the Mesquite Sky wind farm?

Only on the owner's terms. Clearway Energy Group's March 23, 2022 release puts Mesquite Sky at 340 MW and 68 turbines, in commercial operation, and the owner of a wind farm controls who lifts on its site. Turbine work generally calls for a large all-terrain or crawler crane, a lift plan with a wind limit, mats on a prepared pad, and FAA notice under 14 CFR 77.9(a) for a boom more than 200 feet above ground.

Get Your Free Clyde Quote

Free quote

Fields marked * are required.

Your quote comes in writing at no charge, and no crane or machine is scheduled until you say yes.